Burke, R D, Parrish, K and El Asmar, M (2018) Environmental Product Declarations: Use in the Architectural and Engineering Design Process to Support Sustainable Construction. Journal of Construction Engineering and Management, 144(05).

Delgado, L, Shealy, T, Garvin, M and Pearce, A (2018) Framing Energy Efficiency with Payback Period: Empirical Study to Increase Energy Consideration during Facility Procurement Processes. Journal of Construction Engineering and Management, 144(05).

Doloi, H (2018) Community-Centric Model for Evaluating Social Value in Projects. Journal of Construction Engineering and Management, 144(05).

El-Sabek, L M and McCabe, B Y (2018) Framework for Managing Integration Challenges of Last Planner System in IMPs. Journal of Construction Engineering and Management, 144(05).

  • Type: Journal Article
  • Keywords: Production planning; Delphi; Nominal group technique (NGT); Megaprojects; International projects; Last Planner System (LPS);
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)CO.1943-7862.0001468
  • Abstract:
    International megaprojects (IMPs) have a poor record of budget and schedule overruns. Lean Construction methods and the associated Last Planner System (LPS) have been successfully implemented in many projects, but the application of the LPS in IMPs is limited due to integration challenges and organizational behavior issues inherent in IMPs. Integration herein refers to the interfaces between subprojects in a megaproject. This paper introduces the IMPact framework to address integration challenges. A modified two-round Delphi method was used to identify, verify, and rate integration challenges. Thirty-one challenges were identified. After the development of the framework, the nominal group technique confirmed its internal validity. Finally, external validation was achieved in a focus group study. The measurement system of the proposed framework was tested on a real IMP. The validated framework provided a conceptual practical solution, based in LPS, to address the challenges within and across subprojects. It is intended to be an adaptive roadmap to address these challenges and potentially improve the performance of IMPs.

Farshchian, M M and Heravi, G (2018) Probabilistic Assessment of Cost, Time, and Revenue in a Portfolio of Projects Using Stochastic Agent-Based Simulation. Journal of Construction Engineering and Management, 144(05).

Liang, Q, Leung, M and Cooper, C (2018) Focus Group Study to Explore Critical Factors for Managing Stress of Construction Workers. Journal of Construction Engineering and Management, 144(05).

Lines, B C and Ravi Kumar, G G (2018) Developing More Competitive Proposals: Relationship between Contractor Qualifications-Based Proposal Content and Owner Evaluation Scores. Journal of Construction Engineering and Management, 144(05).

Mahpour, A and Mortaheb, M M (2018) Financial-Based Incentive Plan to Reduce Construction Waste. Journal of Construction Engineering and Management, 144(05).

Nguyen, D A, Garvin, M J and Gonzalez, E E (2018) Risk Allocation in U.S. Public-Private Partnership Highway Project Contracts. Journal of Construction Engineering and Management, 144(05).

Rocha, C G d, Anzanello, M J and Gerchman, M (2018) Method to Assess the Match between Clients’ Input and Decoupling Points in Customized Building Projects. Journal of Construction Engineering and Management, 144(05).

Schuldt, S and El-Rayes, K (2018) Optimizing the Planning of Remote Construction Sites to Minimize Facility Destruction from Explosive Attacks. Journal of Construction Engineering and Management, 144(05).

Tembo-Silungwe, C K and Khatleli, N (2018) Identification of Enablers and Constraints of Risk Allocation Using Structuration Theory in the Construction Industry. Journal of Construction Engineering and Management, 144(05).

Yap, J B H, Abdul-Rahman, H and Wang, C (2018) Preventive Mitigation of Overruns with Project Communication Management and Continuous Learning: PLS-SEM Approach. Journal of Construction Engineering and Management, 144(05).

Zhang, M, Cheng, W and Wang, Y (2018) Multiple-Fault Classification for Hot-Mix Asphalt Production by Machine Learning. Journal of Construction Engineering and Management, 144(05).